...and thus far, Trump has done the same. With no hiccups, the first GEN-IV reactors should be producing power from Demo Plants between 2028 and 2030...then, hopefully, siting approvals and grid planning will accelerate so that we have a Grid that is reliable, available and robust enough to minimize the need for gas fired power plants...i.e. much less CO2 from power plants...or from vehicles on our highways...Jets will continue to need AVGas for quite awhile.